







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Bathroom Remodeling Across West Los Angeles
A full bathroom remodel in West Los Angeles typically runs $10,620 – $33,040, and the number that matters more than the range is the one we put in writing before you approve the job. We’re Penhallow Remodeling Los Angeles, and we work across West Los Angeles every week, from the flat lots south of Santa Monica Boulevard up into the canyon streets where parking is its own negotiation and the soil report matters as much as the tile selection. Trevor Nash runs our crew, and his rule is simple: the price you sign is the price you pay, and if something isn’t done right, we fix it within 365 days. Call (213) 277-6578 for a free estimate, and you’ll get a real number, not a ballpark.
Why Penhallow Remodeling Los Angeles Is West Los Angeles’s Preferred Bathroom Remodeling Company

West Los Angeles homeowners tell us the same thing: they’ve been burned by a contractor who quoted low, showed up late, and vanished when the punch list came due. That’s why we operate under the Kingswell standard, established in 2004, which requires a written price before any work starts, a defined arrival window, and a written guarantee on every project. The 365-Day Done Right Promise is in the contract, not a sales line. If your new shower pan cracks or a vanity drawer binds inside a year, we come back at no charge. No re-inspection fee, no second service call, no argument.
Our technicians are background-checked, uniformed, and answer to a live person when you call, 24/7. You won’t get a voicemail maze. You’ll get a human who knows your address and your job. For West Los Angeles specifically, that matters because the work here isn’t a suburban cookie-cutter. Every house has a story, and half of them start with a foundation from 1935 and a subpanel that’s already maxed out.
Styles & brands we work with







Small Bathroom Remodel in West Los Angeles
A Small Bathroom Remodel in West Los Angeles typically runs $5,900 – $14,160, and it’s the most common job we do in the older apartment buildings and single-family homes south of the 10. You’d be surprised what a difference it makes in a 5-by-8 bath in a 1940s bungalow: a new vanity, a tighter toilet footprint, wall-hung storage instead of a pedestal sink, and tile that actually breathes. In West Los Angeles, a small bath remodel often means working with cast-iron drain stacks that are original to the house, so we budget for access from below or through the wall, not just a cosmetic swap.
What We Replace
We handle the full scope: vanity, toilet, tub or shower, tile, fixtures, vent fan, and lighting. Many West Los Angeles small baths were last touched in the 1980s, so we’re also correcting decades of shortcuts. That includes replacing the cement board substrate (the moisture-resistant layer behind your tile) when the old drywall has gone soft.
How Long It Takes
Plan on 7 to 14 days for a small bath in West Los Angeles. If your building is over 40 years old, LADBS may require a plumbing fixture count review even when you’re not moving walls. We pull those permits and coordinate the inspection so you’re not standing in a gutted room wondering what happens next.
Shower Remodel in West Los Angeles

A Shower Remodel in West Los Angeles runs $3,540 – $10,030, and the final number depends on whether you’re keeping the existing footprint or opening a wall to add square inches. In the mid-century apartments and dingbats west of the 405, we see a lot of original mud-set showers with tile over wire lath. They’re durable but ugly, and when the grout fails, water gets into the wall. We rebuild them with a proper waterproofing membrane and a shower pan that drains to code, then tile over a cement board substrate.
Walk-In Shower Conversion
Converting a tub to a walk-in shower costs $4,130 – $11,800 in West Los Angeles. It’s popular in the single-story ranch homes where the original tub is just taking up space. We cap the drain, relocate the supply lines, and build a curbless entry if your framing allows it. If you’re in a hillside lot with a concrete slab on grade, we’ll need to cut the slab to move the drain, which is exactly the kind of thing a flat-rate quote should account for up front. Ours does.
Frameless Glass Enclosures
Custom frameless glass runs alongside the main remodel and is ordered to measure after the tile is set. Lead time on 3/8-inch tempered glass in the West Los Angeles market is running two to four weeks. We order it the day the tile goes up, not after the grout cures, so you’re not showering behind a curtain for a month longer than necessary.
Trusted Brands We Service in West Los Angeles
We install and service the brands West Los Angeles designers actually specify: KraftMaid and Wellborn cabinetry, Cambria and Silestone quartz, Kohler and Moen fixtures. If a client has selected a Toto toilet or a Grohe shower system, we coordinate the rough-in valves and trim kits before the walls close. Trever Nash’s team stocks common cartridge replacements for Kohler and Moen in our Los Angeles warehouse, which means a warranty callback in Mar Vista or Rancho Park doesn’t wait on a parts truck from Ontario. The products behind our 365-Day Done Right Promise are as solid as the promise itself.
Common Bathroom Remodeling Problems We See in West Los Angeles Homes
- Hillside lot surprises. In streets like those above San Vicente and up Bundy toward the hills, the BHO (Baseline Hillside Ordinance) can cap your floor area and force a redesign even when you’re not adding square footage. We check the ordinance before you pick a tile.
- Knob-and-tube wiring behind original tile. Homes built before 1940 in Cheviot Hills and Westwood often have active knob-and-tube circuits that LADBS won’t let us bury under new drywall. It has to be decommissioned or replaced, which is a change order we flag at rough-in, not after.
- Rotted subfloor under cast-iron tubs. A 70-year-old tub that’s been dripping for decades rots the framing beneath it. We find this in about a third of the 1920s-1930s Spanish and Tudor homes we open up.
- Soft-story structural neglect. If your building falls under the LA soft-story retrofit ordinance, the bathroom remodel trigger may require the seismic upgrade of the water heater and any adjacent shear wall to be signed off first. We sequence that before we close walls.
See the difference
Before
After
Before
After
Before
AfterPricing for Bathroom Remodeling in West Los Angeles, CA
Here’s the honest breakdown for the West Los Angeles market. These are real ranges we’ve quoted and built to, not national averages pulled from a search engine:
| Project | Typical Cost in West Los Angeles |
|---|---|
| Bathroom Remodel | $10,620 – $33,040 |
| Small Bathroom Remodel | $5,900 – $14,160 |
| Walk-In Shower Installation | $5,310 – $14,160 |
| Bathroom Vanity Installation | $945 – $3,540 |
What drives the cost up in West Los Angeles? Hillside engineering, seismic strapping, long-lead millwork, and architectural glass. What drives it down? An efficient footprint, stock cabinets, and a shower that keeps its existing rough-in. We give a free, written, line-item estimate. The number on day one is the number on the invoice. Call (213) 277-6578 to schedule yours.
We Also Serve Cities Near West Los Angeles
Our crews work throughout the Westside and the Valley, including Los Angeles, Burbank, Santa Monica, and North Hollywood. If you’re in one of those neighboring cities and looking for Bathroom Remodeling with a written price and guarantee, we can help. See our Bathroom Remodeling in West Los Angeles page for what local pricing and permit sequencing look like.
Serving West Los Angeles, CA - Our Local Coverage Area
We’re based in the West Los Angeles area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs About Bathroom Remodeling in West Los Angeles
It can, yes. The BHO applies to any lot in a hillside zone, and it doesn’t just cap additions. It can restrict floor area, require a geological report, and mandate soils engineering before LADBS will even review a bathroom permit. If your home sits on a canyon lot or a sloped street, we check that first. It adds months, not weeks, so we’d rather know before demo. Call (213) 277-6578 and we’ll walk you through your block’s specifics.
Cabinet lead times run six to twelve weeks for custom lines like KraftMaid and Wellborn. Frameless glass is typically two to four weeks after template. Cambria and Silestone quartz slabs run seven to ten days if the slab is in stock, longer for exotic colors. The schedule for a high-end West Los Angeles bath is governed by these lead times, not by labor availability. We order the long-lead items the week your contract is signed, and the written price covers those commitments up front, so there’s no surprise line item when the glass arrives.
Not the whole house, but the bathroom’s own circuits and water systems may require upgrades. LADBS will flag knob-and-tube wiring that touches the remodeled area, a water heater that isn’t seismic-strapped and flex-connected, and any soft-story shear wall adjacent to wet walls. We handle the required upgrades as part of the remodel scope and write the inspection sequencing into the contract. That way the walls get closed once, not twice.
Because the contractor didn’t open the walls in their original estimate. In West Los Angeles, a 1928 home in Westwood or a 1955 dingbat near Palms is going to have surprises: cast-iron drain stacks, termite damage at the sill plate, old plumbing traps that don’t meet current code. A contractor who quotes without allowances for those conditions passes the risk onto you later. We write a fixed price before demolition, and if conditions change, you get a written change order before we spend another dollar, never after. Call (213) 277-6578 for an exact quote on your house.
Yes, and many West Los Angeles clients do. We coordinate directly with your designer or architect on drawings, finish schedules, and changes. The key is sequencing: drawings must be locked before the BHO review starts, because a floor area cap discovered after demo forces a full redesign and restarts the permit clock. We’ve done this enough in Cheviot Hills and Westwood to keep the designer, the engineer, and the inspector moving in the same direction.
Our Word on West Los Angeles Hillside Work

West Los Angeles hillside and canyon lots trigger the Baseline Hillside Ordinance, and it isn’t a small footnote. Before a bathroom permit is even reviewed, the city can require a geological report and soils engineering. That’s months added to a remodel that in flatland Culver City would clear in weeks. If you’re on a slope, the real playbook is: check the ordinance before finalizing the design, lock the slab and cabinet orders early, and get the seismic strapping for the water heater and any adjacent shear wall signed off before you close the first wall. We do that in West Los Angeles every month, and we’d rather tell you the timeline honestly than hand you a start date that isn’t real.
We recently remodeled a primary bath in a 1920s Spanish Colonial in Cheviot Hills. The client had selected a Kohler cast-iron tub and custom KraftMaid vanity, but the rough-in revealed knob-and-tube wiring and a rotted subfloor under the original tile. We wrote a change order for the subfloor replacement, coordinated the electrical inspection sign-off with LADBS, and kept the Cambria quartz countertop delivery on schedule by locking the slab order before the framing was complete. That’s the difference between a West Los Angeles contractor who plans for what’s in the walls, and one who acts surprised when the walls come down.
Written by Trevor Nash, Owner at Penhallow Remodeling Los Angeles, serving West Los Angeles and the surrounding Westside.











